Output Capacity | 200 KVA |
---|---|
Output Phase | 3 Phase |
Input Phase | 3 Phase |
Full Load Backup | 10-15 Minutes |
Back up at 50% Load | 20-30 Minutes |
Battery DC Bus | 372- Vdc |
Flexible Battery Option | Yes |
Battery Capacity (VAH) | 148800 Vah |
Maximum Charger Capacity | Amp. |
Warranty for UPS | 24 Month(S) |
Warranty for Battery | 24 Month(S) |
Isolation Transformer | In-Built |
Paralleling Options | In-Built |
Battery Interlink Connectors | Yes |
Cabling 5 Meters For Input and Output | Yes |
Battery Rack | Yes |
Paralleling kit for synchronising | In-Built |
Item Image | Item Name | Model No. | HSN Code | Quantity | Unit Price | Total Price |
---|---|---|---|---|---|---|
Grand Total | Rs.2527616 |
Item Image | Item Name | Model No. | Total Price |
---|
Item Image | Item Name | Model No. | Total Price |
---|---|---|---|
Item Image | Item Name | Model No. | Total Price |
---|
this was a perfect solution
Can't beat the price. My son has a lot of toys and burns through a lot of UPS . this was a perfect solution
Five Stars
Great price!
Five Stars
useful
Powerful Buying Experience
These UPS work as I expected.
Seem like good UPS and a fair price
Seem like good UPS and a fair price.Just seems like they are always out of stock and thentakes a long time to ship them out when the do have them.
Some UPS worked okay. I just had a problem
Some UPS worked okay. I just had a problem where a new battery worked for a week and then there was no charge. Not worth the price.
Four Stars
thank you
Pass on the Basics
I waited to write this review until I had tried nearly all of the UPS that I ordered. Most of them did not have any power in them. The few that did work lasted maybe an hour. I pitched the remaining 6 because I cannot depend on them at this point. Maybe I just got a bad batch but these are the worst collection UPS I have ever used. I would not recommend these to anyone else based on my experience.
So far so good
They work
Lot's of UPS
Nice having all these UPS at a good price. Haven't tried yet but, how bad can it be.
Write Your Review
BPE Make 200 KVA 3:3 Phase On-Line UPS with 10-15 Minutes Back up
Our Feedback