BPE Make 5 KVA 3:3 Phase Industrial UPS with 20-30 Minutes Back up

  • UPS System / Industrial UPS
Rs.96322.8Rs.59304


                            

Output Capacity 5 KVA
Output Phase 3 Phase
Input Phase 3 Phase
Full Load Backup 20-30 Minutes
Back up at 50% Load 40-60 Minutes
Battery DC Bus 192- Vdc
Flexible Battery Option Yes
Battery Capacity (VAH) 4992 Vah
Maximum Charger Capacity 10 Amp.
Warranty for UPS 24 Month(S)
Warranty for Battery 24 Month(S)
Isolation Transformer In-Built
Paralleling Options Optional
Battery Interlink Connectors Yes
Cabling 5 Meters For Input and Output Yes
Battery Rack Yes
Paralleling kit for synchronising Optional
Add to cart
Item Image Item Name Model No. HSN Code Quantity Unit Price Total Price
product image BPE Make 5 KVA Industrial On-Line UPS With Isolation Transformer

CP3305L16

85049090

1

Rs.

Rs.0

product image SMF Batteries 12V-26/28AH

SMF12V-26/28 AH

85072000

16

Rs. 3264

Rs.52224

product image Battery Rack for 16 Nos. 12V-26 AH Batteries

BR2616

73269099

1

Rs. 4130

Rs.4130

product image Interlink Connector for 5 KVA UPS - 192 V DC

IC-5KVA-192V

85366990

1

Rs. 2950

Rs.2950

Grand Total
Rs.59304
No addition BOM required.
Item Image Item Name Model No. Total Price
Item Catalogue
cp-series-5-30-kva-online-ups-3-ph-output (Download )
pdf
No addition BOM required.
Item Image Item Name Model No. Total Price
Item Image Item Name Model No. Total Price

Rs.

Rs.

Rs.

Rs.

Rs.

Rs.

Grade
By Tahd Rying 2016-08-01 00:00:00

Poor Quality - Barely Holds a Charge

Horrible quality. These last 4 to 6 days in an Xbox controller and maybe 10 days in a remote. Horrible quality.

Grade
By Christine M 2016-01-01 00:00:00

Three Stars

Lasted half the time as in the same product

Best Featured Products