Output Capacity | 30 KVA |
---|---|
Output Phase | 3 Phase |
Input Phase | 3 Phase |
Full Load Backup | 100 - 110 Minutes |
Back up at 50% Load | 200 - 220 Minutes |
Battery DC Bus | 384 - 480 VDC |
Flexible Battery Option | Yes |
Battery Capacity (VAH) | 72000 VAH |
Maximum Charger Capacity | 9 Amp. |
Warranty for UPS | 12 Month(S) |
Warranty for Battery | 24 Month(S) |
Isolation Transformer | Optional |
Paralleling Options | Yes |
Battery Interlink Connectors | Yes |
Cabling 5 Meters For Input and Output | |
Battery Rack | Yes |
Paralleling kit for synchronising | Optional |
Item Image | Item Name | Model No. | HSN Code | Quantity | Unit Price | Total Price |
---|---|---|---|---|---|---|
Eaton Make 30 KVA 3:3 Phase Industrial On-Line UPS ( GL Series ) |
93E30KVA(GL) |
85049090 |
1 |
Rs. 286150 |
Rs.286150 |
|
Grand Total | Rs.1011966 |
Item Image | Item Name | Model No. | Total Price |
---|---|---|---|
Extended Warranty Charges For Eaton Make 30 KVA 3:3 Phase On Line Industrial UPS |
EXWQ-EAT3330 |
Rs.29500 |
|
Item Image | Item Name | Model No. | Total Price |
---|---|---|---|
Great UPS great price.
Why pay a penny more. They are exactly the same as Duracel or Energizer.
great price.
Decent UPS , great price.
Great value
Good quality UPS and cheap. Tend to get through a lot of UPS and these are as good as high end brands.
Four Stars
thank you
Nice
These UPS are nice for the money and they last as long as the big name brands. Thanks
Very short charge life. Dead in no time.
Lot's of claims in the description and lots of good reviews here, so I don't know what went wrong, but it appears these UPS really stink.In a TV remote, a pair of these UPS lasted 2 weeks. The name-brand UPS they replaced had lasted several months.In an LED flashlight, a pair of these UPS lasted exactly 2 uses before the light got dim and 3 uses before the UPS were totally dead. I'm talking about, like, less than 10 minutes of cumulative use. The previous UPS had lasted dozens of uses probably at least 3 hours of on-time.I don't know if I got a bad batch (a BIG bad batch of 48), or if I was just tricked into having the wrong expectations. Either way, back to name-brand UPS for me.
Write Your Review
EATON Make 30 KVA 3:3 Phase Industrial UPS with 100-110 Minutes Back up
Our Feedback