The Ultron EH series is an online double-conversion 3p-1p UPS which provides reliable power protection for IT rooms, SMBs, telecommunications, banking, medical facilities and industry. Supported with DSP based technology, it offers rapid computation capabilities that enhance system stability and provide precise voltage to load. The Ultron EH series offers many superior features including N+X parallel redundancy and a built-in manual bypass switch to guarantee higher availability and reliability for protecting your critical loads.
Output Capacity | 10 KVA |
---|---|
Output Phase | 1 Phase |
Input Phase | 3 Phase |
Full Load Backup | 110 - 120 Minutes |
Back up at 50% Load | 220 - 240 Minutes |
Battery DC Bus | 240 VDC |
Flexible Battery Option | No |
Battery Capacity (VAH) | 24000 VAH |
Maximum Charger Capacity | 4 Amp. |
Warranty for UPS | 24 Month(S) |
Warranty for Battery | 24 Month(S) |
Isolation Transformer | |
Paralleling Options | Yes |
Rack Mountable | |
Rack Mounting Kit | Not Available |
Battery Rack | Yes |
Battery Interlink Connectors | Yes |
Batteries Positioning | External |
Cabling 5 Meters For Input and Output | |
Paralleling kit for synchronising | Inclusive |
Item Image | Item Name | Model No. | HSN Code | Quantity | Unit Price | Total Price |
---|---|---|---|---|---|---|
Delta Make Charger board of 240Vdc/4A for ULTRON EH 10/15/20kVA internal extension |
5505002452-SP |
85049090 |
1 |
Rs. 9204 |
Rs.9204 |
|
Grand Total | Rs.350230 |
Item Image | Item Name | Model No. | Total Price |
---|
Item Image | Item Name | Model No. | Total Price |
---|---|---|---|
Delta Make Mini SNMP IPv4 (For INX/N/R/RT/HPH Gen 2.0 use with Mini slot in UPS) |
3915100473-S |
Rs.7300 |
|
Delta Make Charger board of 240Vdc/4A for ULTRON EH 10/15/20kVA internal extension |
5505002452-SP |
Rs.7800 |
Five Stars
Good product
Basics UPS
Prior reviews were very good on these UPS so we thought we would give them a try. So far so good! All are still working as described . Will change review should we need to- but now highly satisfied .
Write Your Review
DELTA Make 10 KVA 3:1 Phase On Line UPS with 120-130 Minutes Back up
Our Feedback